dch1950 37 1 Cars Posted October 30, 2010 Hi all, Last week saw completion of my laying out table (used for cutting out patterns) and the start of cover manufacture for real. My fabric supplier has been delayed a bit in producing the green check material (something to do with the dye for the yarn) but I am hoping to have it in he UK in a week to 10 days. See my site gallery when it does turn up. I have finally found a sensible IPP - (they process card payments) who doesn't want to rip me off, so things will move on the shop front soon. Still a mad combination of coding, web site work, machining and generally trying to get things done, but I'll get there. regards to all who are still interested, Dave Share this post Link to post Share on other sites
Miles 331 1 Cars Posted October 30, 2010 Good work, I know anything like this takes a while to sort Share this post Link to post Share on other sites
cRaig 273 1 Cars Posted October 31, 2010 So you are doing the green check material then?! Sorry I pestered you about it earlier Share this post Link to post Share on other sites
dch1950 37 1 Cars Posted October 31, 2010 So you are doing the green check material then?! Sorry I pestered you about it earlier No worries - even pestering is feedback (of a kind). I can never tell what the demand is though so I'm flying blind - and have been for most of the last 8 months. I haven't actually got a sample yet - but I'm assured by my fabric supplier that it will be ready soon and you will be the first to see it. I do keep my website pretty up to date though - so check there first (go on - you know want to!) best regards Dave Share this post Link to post Share on other sites
cRaig 273 1 Cars Posted October 31, 2010 I did check out your website last week, so im trying to keep up to speed with how its going All the best for the final bits and pieces before you go into production Share this post Link to post Share on other sites